Sexta-feira, 12 de Junho de 2009

Stringer

After nearly two weeks of low temperature and rain I finaly managed to add another step to the project. Here I'm gluing the stringer. Tomorrow I should be able to vacuum bag the laminate.
I also decided to use peel ply as much as possible on laminated areas where other laminations will take place. This avoids sanding and leaves a nice surface for post bonding. At the far end of the stringer one can see the peeled surface patch where the later the forward beam bulk head will be bonded.

0 comentários:

Enviar um comentário