sexta-feira, 12 de junho de 2009

Stringer

After nearly two weeks of low temperature and rain I finaly managed to add another step to the project. Here I'm gluing the stringer. Tomorrow I should be able to vacuum bag the laminate.
I also decided to use peel ply as much as possible on laminated areas where other laminations will take place. This avoids sanding and leaves a nice surface for post bonding. At the far end of the stringer one can see the peeled surface patch where the later the forward beam bulk head will be bonded.

Sem comentários:

Enviar um comentário